SystemSYS-2026-0101v0.1
XA-03 — telemetry and run logger (physical execution evidence layer)
Provider-agnostic logger that records one benchmark run as append-only events plus telemetry and derives a typed summary deterministically: model-invocation, trajectory, tool-call and verifier spans, candidate created/discarded accounting, wall time, device-time, GPU power integrated to device_energy_j (energy type device_measured, never relabelled as marginal), peak memory and memory residency, with unknowns kept null (Unknown ≠ 0) and forbidden conversions (tokens → J, TDP → J, price → J, GPU-hours → J). Golden fixture 450 J / 1.75 util·s / 12 GB peak / 33 GB·s residency verified; 35 passed, 1 skipped in 0.39s; instrumentation burden is calibrated and reported, not subtracted.
Purpose
purpose- Make the physical side of an IPM event (wall time, device energy, memory residency, utilization, operational counts, discarded work) reproducible evidence rather than a claim.
Architecture
architecture- RunSession → EventLogger (paired spans) + TelemetryCollector (Null / System via psutil / NvidiaSmi) → MetricIntegrator (deterministic) → RunSink with atomic finalization (.partial → COMPLETE | ABORTED) and crash recovery that never invents end events; JSON schemas for events, telemetry and run summary.
Repositories and sites
documentation- README.md, SPEC.md (36 sections), IMPLEMENTATION_PLAN.md, validation_report.json inside the package
Recorded fields
tags- EML-IPM-XA-03
- v0.1
- PRE_RELEASE_VERIFIED
- Python ≥3.11, no runtime dependencies
Relations
| Source | Relation | Target | Status | ID |
|---|---|---|---|---|
SYS-2026-0101 XA-03 — telemetry and run logger (physical execution evidence layer) | implements | THY-2026-0105 Physical computation cost vector and computational spacetime | ACTIVE | REL-2026-0448 |
SYS-2026-0101 XA-03 — telemetry and run logger (physical execution evidence layer) | implements | THY-2026-0104 Energy accounting hierarchy and thermodynamic type safety | ACTIVE | REL-2026-0449 |
SYS-2026-0101 XA-03 — telemetry and run logger (physical execution evidence layer) | supports | RES-2026-0101 Execution and physical line — what one answer costs in turns, semantic work, energy and computational spacetime | ACTIVE | REL-2026-0450 |
SYS-2026-0101 XA-03 — telemetry and run logger (physical execution evidence layer) | released_as | ART-2026-0114 EML-IPM-XA-03 v0.1 — telemetry and run logger reference implementation artifact://evemisslab/intelligence-physical-metrology/IPM_v0.2_XA03_Reference_Logger_v0.1.zip | ACTIVE | REL-2026-0451 |
EXP-2026-0102 XA-05 — 36-trial end-to-end smoke gate with a scripted provider (synthetic) | runs_on | SYS-2026-0101 XA-03 — telemetry and run logger (physical execution evidence layer) | ACTIVE | REL-2026-0468 |
EXP-2026-0103 XA-06 first real-model pilot — Qwythos-9B-v2 on the A0→A5 ladder (36 trials, 2026-09-03) | runs_on | SYS-2026-0101 XA-03 — telemetry and run logger (physical execution evidence layer) | ACTIVE | REL-2026-0475 |
History and provenance
- Canonical URL
- https://evemisslab.com/ai/systems/SYS-2026-0101/
- Machine-readable
/ai/systems/SYS-2026-0101/index.json- Snapshot
AI-SNAPSHOT-v0.1-fe85b9694a45- Provenance
source- EveMissLab research collection: Intelligence Physical Metrology (真本體論13)
extracted_by- Splice (Claude Code), reading the canonical UTF-8 sources and each package's own reports
extracted_at- 2026-09-11
generator- tools/extract_all.py
claim_boundary- status, evidence level and result type follow the source artifact's own stated claim boundary; nothing is upgraded beyond what the report supports